A trusted preclinical partner to secure and accelerate your drug pipeline

Contact an expert

Impeccable data is essential to win over investors, KOLs, and regulatory bodies. That’s why a trusted preclinical service provider that you can rely on is a strategic priority for any biotech/medtech company outsourcing its efficacy studies.

With over 35 years of experience, ETAP-LAB has developed an exceptional range of preclinical services that combine scientific rigor with the highest industry standards required by decision-makers. We apply our core values of Excellence, Transparency, Agility and Proximity to evaluate your drug candidates (small molecules, antibodies, biotherapies, cell therapies, etc.), medical devices, and nutraceuticals.

Science Exchange logo as verified supplier for the CRO
  • Responsive and meticulous customer service: We respond to your requests within 48 hours of receipt.
  • Innovative models at the right price:  Optimized study designs implemented by qualified and efficient staff for service with high added value.
  • Personalized support: Customized studies designed and conducted by an expert team; a single study director, your dedicated and responsive contact person.
  • Reliable and reproducible data: Robust models and quality control of raw data analyzed with support from our biostatisticians.
  • Translational approach: Predictive tools and models to maximize the clinical relevance of your results.
  • Holistic ethical approach: Study transparency, respect for animals, tolerance and inclusivity, managerial practices—our team applies a fully ethical approach.
35 years
of scientific excellence
Contribution to the successful market launch of many health products.
Quality and traceability
Compliance with industry standards for your efficacy studies.
Comprehensive study reports
Standalone reports that comply with ARRIVE guidelines for your IND applications.
Ethics and animal welfare
Best practices that go beyond current regulations.
Work with ETAP-LAB

Our core values of Excellence, Transparency, Agility, and Proximity guide us every day as we strive to better support you.

Your trusted partner to accelerate the development of your therapeutic innovations.

Working with us – etap logo fondbeige

Workflow for a preclinical in vivo project

Simple and transparent process

ETAP-LAB manages each preclinical project according to a simple and transparent process in collaboration with you and your teams.

Working with us – contact
Working with us – client need
Working with us – proposition tech
Working with us – plan etude gantt
Working with us – prepa etude
Working with us – realisation de letude suivi
Working with us – result prelim
Working with us – final report
Working with us – ressources data
Working with us – satisf

Our loyal customers

With a rating of 100% for customer satisfaction in 2024, our customers do the talking for us!

Continuous monitoring throughout the entire study. Excellent communication, ensuring a seamless and productive working relationship.
Project Manager
Pharmaceutical industry

Customer satisfaction: our top priority

Commitment to quality
Quality is the cornerstone of our corporate culture. ISO 9001 certified (Nancy and Caen sites).
100% customer satisfaction rate
Our customers give us an average rating of 9.3 out of 10 for the quality of our preclinical services (CSAT 2024: 100%).
Ethical conduct and transparency
Compliance with European standards, member of the CELMEA committee, application of the 3Rs and development of NAMs.